Backlog and planning - HL7 BE FHIR Profiles

From Health Level 7 Belgium Wiki
Revision as of 12:55, 29 February 2020 by Jose Costa Teixeira (talk | contribs) (Jose Costa Teixeira moved page Plan and backlog - HL7 BE FHIR Profiles to Backlog and planning - HL7 BE FHIR Profiles without leaving a redirect)

Planned scope for FHIR Standardisation and profiling

  • Communication / Journal
  • HomeCare Team
  • HomeCare Plan
  • Allergy / Intolerance
  • PatientWill
  • Addiction



Technical backlog

  • Summary - align Sumehr and IHE, HL7 IPS.