Minutes - FHIR Validation Group 2022-06-23

From Health Level 7 Belgium Wiki

Thursday, 23rd June 2022, 10:00 CET

Agenda


  • Cancer screening:
    • Project proposal -- WGSE/Program Board
    • Call for business experts and HL7 experts
  • Medication Scheme:
    • Project proposal status
    • Where in the process?
  • Patient will:
    • Status
  • BeAuditEvent
  • Implementation Mapping
  • Baselining BeProblem
  • Color scheme for IG status
  • Logical Models / ZIBs


Participants

  • Ingrid Mertens
  • Nick Silverans
  • Anne Nerenhausen
  • José Costa Teixeira
  • Hanne Vuegen
  • Bart Decuypere
  • Philippe Baise
  • Jean-Michel Polfliet
  • Filoretta Velica
  • Veerle Michiels
  • Isabelle Pollet
  • Karlien Erauw
  • Félix de Tavernier

Minutes

FHIR governance process

  • We added an issue to include terminology process in our Standardization process
  • We will have a meeting to detail the operational aspects
  • We will provide by 7th July a Candidate publication of our process documentation that is ready for eHealth publication.
  • We will include the description of all the participants in the process
    • Include the criteria/list of who is invited
    • Roles and responsibilities

AllergyIntolerance

Cancer screening

  • Proposal for engaging WGSE in the Project Proposal review
    • The Project proposals will be checked by the Validation WG.
    • The Project proposals will also be sent to the WGSE. The WGSE may want to
      • discuss internally - and for this the WGSE may either
        • have an ad-hoc WGSE meeting,
        • or wait for the next quarterly meeting
      • OR take a slot directly in the next Validation WG.
  • Call for business experts and HL7 experts
    • the project team will call for the Business Experts Work group
    • the will let HL7 Belgium know when the HL7 Experts group needs to be assembled

Medication Scheme

Link to Project proposal google drive: https://docs.google.com/spreadsheets/d/15fEJTQIAeUk95Xn1SlwEO8G3mZ1wGrOKq-Ow5G055wQ/edit#gid=1020612342

  • Medication Schema Project Proposal was in Draft, and the Validation WG did not evaluate it yet.
    • We will prepare the project proposal and present to the Validation Group

Patient will

  • Business Experts meetings are expected to start in September

BeAuditEvent

  • Vitalink is using AuditEvent, there is no profile for Belgium
    • We can start the process for a project to use AuditEvent in Belgium. VAZG volunteers to draft the project proposal for capturing, collecting and sharing Audit Events.

Implementation Mapping

  • We could have a mapping of the existing interoperability and functionalities implementations in Belgium
  • It would be interesting to capture the actual implementations of FHIR profiles, actors, etc.
  • HL7 Belgium technical team will have some discussions on this topic

Baselining BeProblem

Postponed

Project Proposal for Labo

Postponed


Color scheme for IG status

eHealth shared the color scheme for the profiles:

  • Yellow - Development IGs
  • Red - HL7-BE publications
  • Green - eHealth publications

The actual detailed color scheme (which colors actually change) will be proposed by eHealth and validated in a future HL7 Validation meeting by looking at 3 branches of an IG, each with its color.