Difference between revisions of "Minutes - Population Health WG 2023-03-14"

From Health Level 7 Belgium Wiki
(Created page with "=== Attendees === * Bart Decuypere * Hanne Vuegen * Jean-Michel Polfliet * Karlien Erauw * Kurt Dhaene * Veerle Michiels === Excused === * Brecht Van Vooren * José Costa Te...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Attendees ===
 
=== Attendees ===
* Bart Decuypere
 
 
* Hanne Vuegen
 
* Hanne Vuegen
* Jean-Michel Polfliet
+
* José Costa Teixeira
 
* Karlien Erauw
 
* Karlien Erauw
 
* Kurt Dhaene
 
* Kurt Dhaene
 
 
* Veerle Michiels
 
* Veerle Michiels
  
 
=== Excused ===
 
=== Excused ===
 +
* Bart Decuypere
 
* Brecht Van Vooren
 
* Brecht Van Vooren
* José Costa Teixeira
+
* Jean-Michel Polfliet
 
* Patrick Beyltjens
 
* Patrick Beyltjens
  
Line 18: Line 17:
 
=== Minutes ===
 
=== Minutes ===
 
* [https://github.com/hl7-be/public-health/issues/30 New issue 30]
 
* [https://github.com/hl7-be/public-health/issues/30 New issue 30]
::* extension will stay
+
::* extension will stay: https://build.fhir.org/ig/hl7-be/public-health/branches/master/StructureDefinition-PopulationScreeningNextInvitation.html
::* communication resource: to be checked if profile is needed
+
::* CvKO wants to add additional info is the investigation has aberrant results
 +
::* communication resource:
 +
::* in the future we could look into a care plan (not yet)
 
::::* this will refer to the episode of care  
 
::::* this will refer to the episode of care  
::* WG decides to adopt the Communication resource to convey this information, and we will join it to the existing structure using the Communication.about field, which will refer to the EpisodeOfCare. The existing extension will remain in place.
+
::* WG decides to adopt the Communication resource to convey this information, and we will join it to the existing structure using the Communication.about field, which will refer to the EpisodeOfCare. The existing extension will remain in place
 +
::* what kind of valueset do we want ?
 +
::::* preference goes to having one valueset
 +
 
  
 
* when can we expect a publication ?
 
* when can we expect a publication ?
 
::* this will have to be included
 
::* this will have to be included
 
::* it has to be approved by the WGSE that takes place on 17 March
 
::* it has to be approved by the WGSE that takes place on 17 March
 +
 +
* Actions: BeCommunication needs to be added
 +
::* there are 2 types of communication : one is the observation (with the result: positive or negative or a text), other is textual communication
  
 
=== Action Items ===
 
=== Action Items ===
* the publication will have to be validated through the WGSE meeting that occurs on 17 March at 10AM
+
* the publication will have to be validated through the WGSE meeting that occurs on 17 March at 10AM but it is not ready - to be decided who will make the changes to the IG (by Veerle)
  
 
=== Date next meetings ===
 
=== Date next meetings ===
* Next meeting - X March at 1PM
+
* Next meeting - TBC

Latest revision as of 13:21, 14 March 2023

Attendees

  • Hanne Vuegen
  • José Costa Teixeira
  • Karlien Erauw
  • Kurt Dhaene
  • Veerle Michiels

Excused

  • Bart Decuypere
  • Brecht Van Vooren
  • Jean-Michel Polfliet
  • Patrick Beyltjens

Agenda

  • Resolution of new issue

Minutes

  • this will refer to the episode of care
  • WG decides to adopt the Communication resource to convey this information, and we will join it to the existing structure using the Communication.about field, which will refer to the EpisodeOfCare. The existing extension will remain in place
  • what kind of valueset do we want ?
  • preference goes to having one valueset


  • when can we expect a publication ?
  • this will have to be included
  • it has to be approved by the WGSE that takes place on 17 March
  • Actions: BeCommunication needs to be added
  • there are 2 types of communication : one is the observation (with the result: positive or negative or a text), other is textual communication

Action Items

  • the publication will have to be validated through the WGSE meeting that occurs on 17 March at 10AM but it is not ready - to be decided who will make the changes to the IG (by Veerle)

Date next meetings

  • Next meeting - TBC